Delivery of Form B designs for interventions on the Ferrybridge to Goole route to facilitate a resignalling scheme this involved:
- Development of existing Form-A to detailed design
- 4 No. interventions including S&C design and plain lining
Key points
- Crossover renewal near an existing level crossing required staging to keep the existing crossover in operation during works
- Multidiscipline interventions required coordination