ClientOSL
ProjectGatwick (Brighton Mainline Upgrade Programme)
Duration12 Months
Value£80,000

Project Description

As part of the Brighton Mainline Upgrade Programme (BMUP) it is proposed to upgrade the capacity and operational flexibility of Gatwick Airport Station by providing additional connections to the Reversible Line and widening Platform 6 to suit the new track alignment. The proposed connections are the 1713 Pts (NR60 F21 Mk.2) and the 1714 Pts (NR60 F28 trans Mk.2) which are located on the Down Platform Loop line at the London and Country ends respectively. The project also involved platform edge modification schemes to facilitate the implementation of the new alignment in addition to gauging of proposed infrastructure to demonstrate compliant structural clearances. InoRail’s involvement has spanned GRIP stages 2 to 6, noting the following key elements;

  • Use of the NR60 Mk.2 S&C catalogue
  • Designing to existing constraints such as bridge priers between Platform 6 and 7 and line side infrastructure
  • Bespoke design solutions to facilitate change from CEN56 to CEN60 within S&C
  • Staged designs and submissions to implement the construction works across multiple weeks
  • Integrating with existing designs currently under construction
  • Managing existing non-compliant heights and offsets within Platform 7