Delivery of Grip 4&5 design in support of CP6 works delivery renewals. The initial work package encompassed a total of 9 sites, which were quite varied in nature.
Scope of works included;
The design element included traditional plain line design, long timber renewals (including renewal / re-design of holding down arrangements) and Switch & Crossing design for the double junction at Marple Wharf. In addition, we developed an Option Selection Report for the conversion of a UB119 from long timber to slab track
InoRail worked closely with CRSA and the Network Rail project team to develop the project scope and produce fully integrated design solutions