ClientBuckingham Group Contracting Limited
ProjectWigan North Western
Duration12 Months
Value£110,000

Project Description

The project scope involved a multi-million-pound platform extension scheme at Wigan North Western Station to provide passengers travelling to Manchester and Leeds with longer and more reliable trains. The work, as part of the Great North Rail Project, entailed the lengthening of platform 3 so it was able to accommodate longer four-carriage trains. Specific scope of works included;

  • Platform 3 Extension
  • Removal of Platform 2 line
  • De-commissioning of OHLE

InoRail provided the following services to facilitate the delivery of the scheme;

  • Engineering Assurance, provision of Contractors Engineering Manager
  • Grip 3 Optioneering
  • Grip 4 Outline design Track (Form-A) and Civil Engineering (F001) submissions
  • Grip 5 Detailed design Track (Form-B) and Civil Engineering (F002/003) submissions
  • Buffer Stop Risk Assessment
  • Signal Overrun Risk Assessment
  • Fire Safety Strategy
  • Management of CSM-RA